Scope
The A629 Phase 1b, Halifax to Huddersfield improvement scheme, is a £27m project which represents the largest civil engineering investment in the Calderdale region for several decades.
The project includes creation of a new link road and junction, widening of existing roads, provision of facilities for pedestrians and cyclists plus a new bus lane and landscaping works.
The project’s aims are to reduce journey times between Huddersfield and Halifax by up to 30%, improve access to several currently poorly served areas and subsequently to improve air quality and reduce rat running on smaller village roads in the area.
Challenge
On behalf of the Local Authority and funded by Government-backed organisations, the project’s environmental impact was always under scrutiny. Specifying lighting and welfare with demonstrable ESG benefits from Welfare Hire gave John Sisk the assurance that they were achieving best practice against those targets and aspirations.
Results
Fuel saving
CO2 Emissions Saving
Cost Saving
Using sustainable products that go further with reductions in fuel and emissions is a winner with our local government client. With Welfare Hire, the data on power use is kept so we can fully demonstrate those savings.
Quality – Market leading products…always
With the largest and most modern fleet of innovative ECO units in the market, underpinning high specification and standards of quality enables delivery of high-quality work to optimise project productivity. Providing a range of smart, eco units with modern design features ensures adopting the very latest in smart, innovative ECO welfare and lighting.
- Largest & most modern fleet
- Average age 2.5 years
- Unique design
- Highest quality
Our Account Manager has kept in regular contact so that we can explain our changing requirements. Welfare Hire has always delivered what we need efficiently, with excellent communication throughout.
Service – Expert support from passionate professionals
We add significant value by reliably delivering equipment to site when required, ensuring site can operate efficiently to meet deadlines. With a comprehensive 62-point Quality Assurance regime and dedicated specialist service teams, our perfect hire run rate of 99.1% minimises downtime. As a specialist, we dedicated our support services to meet our client requests and optimise project efficiencies.
- Specialist service & support
- 99.1% perfect hire days
- Personal touch
- Market-leading Quality Assurance
Using sustainable products that go further with reductions in fuel and emissions is a winner with our local government client. With Welfare Hire, the data on power use is kept so we can fully demonstrate those savings.
Environment – Up to 15x lower CO₂ emissions
Our modern and efficient ECO units help deliver project goals on sustainability, social value and efficiencies. By using next-generation hybrid Solar/Lithium power, we reduce CO₂ emissions, minimising fuel consumption and noise pollution, whilst providing optimal onsite welfare and lighting facilities.
- Hybrid Solar/Lithium Power
- Silent, green running
- More powerful & brighter
- Reduce services & transport
The brightness of the lights is impressive and our teams appreciate the size and quality of Welfare Hire’s modern welfare facilities, so that they can work and rest properly.
Wellbeing – Highest standards for smart and safe working
Larger, better designed, modern welfare units provide more space for the number of workers onsite, which as a result optimises productivity around break times and contributes to a more motivated workforce.
- Top quality
- Comfortable & Spacious
- Modern design & Multiple facilities
- Priority for the workforce
I’m astonished by the savings we’ve achieved to date. Using the site data to calculate this proves how well the sustainable technology is working, making us more efficient every day.
Value – Cost savings and added value
Our mobile ECO units don’t compromise, enabling greener, cleaner solutions for carbon reduction whilst delivering optimal productivity onsite. This enables us to dramatically reduce running costs, as well as carbon and noise pollution, whilst improving welfare and lighting facilities to add value in delivering on sustainability, safety and social value targets.
- Minimise fuel & operating costs
- Reduce noise & carbon pollution
- Commercial & operational benefits
- Deliver on ESG targets
Tower Lights
Greenest, brightest lights – optimise operational performance and carbon reduction.
Welfare Units
15x CO₂ reductions with Smart hybrid power management.
Results
Providing the most sustainable welfare units and tower lights has supported our client in project savings and in contributing to ESG goals, allowing them to focus on the works they’re delivering. Operating costs, fuel use and emissions are all significantly reduced from the Smart ECO power systems, with no compromise on performance. Worksite teams operate efficiently and safely, with super-bright lighting and comfortable, XL welfare spaces for improved wellbeing.
Fuel saving
CO2 Emissions Saving
Cost Saving
Noise Saving
Servicing Saving
Fuel and Risk Saving
Gallery