WATER

Site Welfare for AMP8 Water schemes

Get it right on site – with the UK’s largest modern ECO welfare fleet.

Why choose Welfare Hire?

ECO INNOVATION

Smart, ECO site welfare solutions for water sector projects

TOTAL SERVICE PROVIDER

Specialist hire partner with dedicated in-house support and nationwide coverage

UK’S LEADING PROVIDER

Operating the UK’s largest and most modern fleet

UNRIVALLED EXPERTISE

Two decades of experience as a specialist partner in the water sector

Welfare Units

SMART ECO MOBILE WELFARE UNITS

Built for remote water infrastructure sites, these towable, self-contained units are ideal for rural pipeline upgrades, emergency callouts and off-grid works.

Each features:

  • Drying rooms with XL capacity
  • XL water-flush WCs
  • 20% larger interiors with separate offices and canteens

Powered by supersized solar-lithium hybrid systems, they cut emissions, lower fuel use and support AMP8 carbon reduction targets.

Welfare Vans

ULEZ Compliant Welfare Vans

Fast, flexible welfare designed for mobile water sector teams – ideal for reactive maintenance, utility callouts or compact sites.

Each van includes:

  • Toilet and wash facilities
  • PPE hanging & drying space
  • Canteen and table seating

A compact, all-in-one solution that ensures compliance, comfort and efficiency on the move, while supporting operational continuity with minimal setup required.

Tower Lights

lithium hybrid led lighting

These silent, road-towable lighting towers offer ultra-low fuel use, lasting up to 965 hours between refuels, while reducing noise pollution and optimising health and safety. Six powerful LED heads provide full visibility, illuminating an area the size of half a football field – ideal for ensuring compliance during night-time operations.

  • Up to 965 hours of runtime – fewer refuels, less downtime and lower operating costs
  • Silent, green running – ideal for noise-sensitive and urban environments
  • Six powerful LED heads – illuminating up to half a football pitch for safer, compliant night-time operations

 

 see what our customers have to say…

Be it planned or critical response work, as a reliable partner we guarantee nationwide coverage and consistently high quality of products to enable completion of key projects on time. Having a modern and flexible proposition of ECO mobile welfare and lighting allows our partners to get the job done safely and smartly, regardless of the location or time of working.

The quality of the welfare provided enabled our teams to work smarter and deliver a much higher standard of work in a modern, comfortable environment. The fast and easy service means we can focus on the job at hand.

Delivering sustainable, cost effective welfare solutions…

Partnering with national and regional contractors, Welfare Hire deliver a cost-effective solution to support government initiatives and ensure the highest standards are met. Stakeholder management and ESG goals do not need to be compromised when using our ECO smart products and services.

As a business we take the welfare of our employees seriously. Welfare Hire’s products provide a mobile workplace that meets our high expectations and standards.

Reduce Downtime, Cut Emissions & Stay Compliant

Don’t let welfare become your weakest link

Inadequate welfare isn’t just a compliance risk, it’s a reputational, operational and commercial threat.

  • HSE penalties and legal exposure: Site closures, fines and investigations are real risks
  • Project delays and contractor liability: Downtime from poor welfare damages timelines and health standards
  • Reputational damage: Clients and frameworks expect high standards — failures impact future bids

We help you eliminate compliance risk before it impacts your project.
Don’t overlook the infrastructure behind the infrastructure.

Act now – Your AMP8 projects can’t wait. Neither should your welfare plan.

As mobilisation builds, stock is being reserved further in advance and availability is tightening. Contractors securing units early are:

  • Guaranteeing dependable welfare for long-term rollout programmes
  • Securing next generation, smart solutions 
  • Meeting carbon and wellbeing standards under growing scrutiny

Why choose Welfare Hire Nationwide?

✔ The UK’s largest and most modern mobile ECO fleet
✔ Nationwide coverage and setup for remote locations
✔ Full compliance with HSE and AMP8 environmental standards
✔ Remote diagnostics and fast-response servicing

 

Get it right on site
with Welfare Hire

The UK water industry is committed to achieving net-zero operational emissions by 2030.

We’re here to help future proof smart, safe and green projects delivering added value. DON’T COMPROMISE.

Start a conversation with us.

If you’re interested in finding out more, get in touch and we’ll get back to you promptly.